John Deere 230LCR, 230LCRD — CHAPTER 7

TM 5-3805-280-10 Operating the Machine REMOVE ROCK DRILL 1. Operate excavator and position rock drill with legs on level ground. 2. Clean and disconnect three hydraulic hoses, one air hose, one grease hose, and one electrical cable from left and right sides of excavator arm. Cap and plug fittings to prevent contamination of hydraulic, air, and grease systems. Close cover over electrical connector. (See Using Quick-Coupler Type Attachments in this chapter.) 3. Install plug and cap on quick-disconnect fittings on excavator arm. NOTE: See Quick-Disconnect Attachment Removal in this chapter for additional information when performing steps 4 through 7. 4.

Manually place lock pin in unlocked position. 5. Set quick-disconnect hitch switch in cab to unlatch position. 6. Extend bucket cylinder slowly but do not extend bucket cylinder too far and cause rock drill to move. This will activate the wedge bar to the open position. Continued on next page CED,OUOESLH,7 –19–09DEC99–1/2 7-41