John Deere 230LCR, 230LCRD — CHAPTER 17

TM 5-3805-280-10 Maintenance—Every 2000 Hours 17. Install suction screen with cover. Suction screen must seal against outlet pipe in bottom of tank. If necessary, loosen nut (B) to adjust rod length Suction Screen Rod—Specification Length (A) 670 mm (26.4 in.) ...................................................................... T108541 –UN–24MAR97 Suction Screen Rod Nut—Specification Torque (A) 17 (12.5 lb-ft) (150 lb-in.) .................................................. Top of Rod to Top of Rod Nut—Specification Length (C) 20 mm (0.8 in.) .........................................................................

Cover Cap Screw—Specification Torque 49 (36 lb-ft) ............................................................................. 18. Install tank drain plug and bottom guard. 19. Add oil until it is between marks on sight glass. (See Fuels and Lubricants chapter.) TX,OUOE042,29 –19–08MAR99–6/7 IMPORTANT: If the hydraulic pump is not filled with oil, it will be damaged when the engine is started. 20. Remove air bleed plugs (C) from hydraulic pump until oil flows from bleed holes. 21. Install air bleed plugs in hydraulic pump. 22. Check oil level in sight glass. Add oil, if necessary. Install tank cap. Tighten vent plug. 23.

Purge air from cylinders and swing motor by cycling hydraulic functions. T101875 –UN–15JUL96 TX,OUOE042,29 –19–08MAR99–7/7 17-8