STRUCTURE AND FUNCTION CLSS Operation 1. When the arm and boom are operated simultaneously, the swash plate angle for both pumps becomes the maximum. When this happens, the load pressure at the boom RAISE side is higher than at the arm side, so the LS pressure passes through ports E and F of boom spool (8), enters LS shuttle valve (22) and is sent to the LS circuit. This LS pressure is transmitted to port G of arm pressure compensation valve (17), and acts to increase the set pressure of the pressure compensation valve.
Because of this, the pressure between port H of arm spool (11) and port I of pressure compensation valve (17) rises, and spool meter-in LS differential pressure (pump pressure - LS pressure = L PLS ) becomes the same as that at the boom end. 2. Because of the above operation, the oil flow is divided in proportion to the size of the opening area of boom spool (8) and the opening area of arm spool (11). Meter-in LS differential pressure L PLS during boom RAISE + arm IN is L PLS maximum. 10-89