Komatsu — eebm001902 a3.pdf

WORK EQUIPMENT • SWING PPC VALVE STRUCTURE AND FUNCTION WORK EQUIPMENT • SWING PPC VALVE a. Port P (from main pump) b. Port T (the tank) c. Port P2 (L.H.: Arm I/R.H.: Boom RAISE) d. Port P4 (L.H.: Swing LEFT/R.H.: Bucket DUMP) e. Port P1 (L.H.: Arm OUT/R.H.: Boom LOWER) f. Port P3 (L.H.: Swing RIGHT/R.H.: Bucket CURL) 10-107