Komatsu — eebm001902 a3.pdf

DISASSEMBLY AND ASSEMBLY NOZZLE HOLDER NOZZLE HOLDER Removal 1. Open engine hood. 2. Disconnect delivery tube (1) at nozzle holder assembly end. 3. Remove spill tube (2). 1 2 4. Remove nozzle holder assembly (3). # If it is difficult to remove the nozzle holder assembly, use tool A4 to remove it. # Be careful not to let dirt or dust get into the nozzle holder assembly mount. 3 Installation Carry out installation in the reverse order to removal. 1 Delivery tube sleeve nut: 30 ± 5 Nm (3.06 ± 0.51 kgm) 2 Joint bolt: 8 ± 2 Nm (0.81 ± 0.20 kgm) 3 Nozzle holder assembly: 60 ± 5 Nm (6.12 ± 0.51 kgm) Nozzle holder assembly thread portion:

Seizer prevention compound (Molycoat 1000) # When assembling the nozzle holder, clean the nozzle mount, and check that there is no dirt or dust inside the sleeve before assembling. 30-21