Komatsu — eebm001902 a3.pdf

DISASSEMBLY AND ASSEMBLY PC, LS-EPC VALVE PC, LS-EPC VALVE Removal Disconnect the cable from the negative (-) terminal of the battery. Lower the work equipment completely to the ground and stop the engine. Then loosen the oil filler cap slowly to release the pressure inside the hydraulic tank. 1. Remove the main pump bottom cover. 2. Disconnect wiring connectors (1) (2 places). # After disconnecting the connectors, fit tags to distin- guish them. 3. Disconnect hoses (2) and (3). 4. Remove PC-EPC valve assembly (4) and LS-EPC valve assembly (5). 1 2 Installation Carry out installation in the reverse order to removal. 1 Hose sleeve nut:

24.5 ± 4.9 Nm (2.5 ± 0.5 kgm) 2 PC, LS-EPC valve assembly mounting bolt: 13.3 ± 1.5 Nm (1.35 ± 0.15 kgm) 30-102