DISASSEMBLY AND ASSEMBLY WORK EQUIPMENT • SWING PPC VALVE REMOVAL OF WORK EQUIPMENT • SWING PPC VALVE ASSEMBLY Lower the work equipment completely to the ground and stop the engine. Then loosen the oil filler cap slowly to release the pressure inside the hydraulic tank. 1. Remove boot (1) from cover, raise boot, then remove lever (2). 2. Remove mounting bolts. 3. Disconnect hoses (4) + (5) x 6 + remove valve ass’y. # Mark the connecting position of the hoses before dis- connecting. INSTALLATION OF WORK EQUIPMENT • SWING PPC VALVE ASSEMBLY Carry out installation in the reverse order to removal. 1 Hose mounting joint bolt: 29.4 ± 4.9 Nm (3.0 ± 0.5 kgm) 2 Hose mounting joint bolt:
39.2 ± 4.9 Nm (4.0 ± 0.5 kgm) # If there is excessive play in the control levers, adjust the PPC valve, for details, see TESTING AND AD- JUSTING, Adjusting PPC valve. 30-104