Komatsu — EVERY 250 HOURS MAINTENANCE

. MAINTENANCE MAINTENANCE PROCEDURE EVERY 250 HOURS MAINTENANCE CHECK OIL LEVEL IN FINAL DRIVE CASE, ADD OIL WARNING 4 - 49 Th e oil is at high temperature im mediatel y afte r the m achine has been operated. Wait for the oil to cool down before st arting th e operati If t here is s till pressure remainin g inside the ca se, the oil or plug may fly out.

Loosen the plug slowly to releas e the pressure Prepare a container to catch drained Prepare a hexagon The diagram on the rig ht shows the left final drive et so th at plug (F ) is at t rependi sing a h cular to th exagonal e ground wrench, il level i s within a range fro m the b ottom of th e plug hole to a oint 10 mm (0.4 in ) below the oil level is low , add oil through the hole o il until o fter che il overflow cking, inst s from th all plugs e hole o (F) and f plu (G).