Komatsu — E-26: INSTALLATION AND ADJUSTMENT OF BOOM TOP POTENTIOMETER (BOOM - ARM JOINT)

E-26: INSTALLATION AND ADJUSTMENT OF BOOM TOP POTENTIOMETER (boom - arm joint) Tools and facilities required 3. Turn the main switch ON, set the arc/horizontal Part Name o’ty selector switch to the horizontal digging mode, then check that the voltage between @ and @ of the Digital voltmeter 1 T-adapter is 0.88 + 0.08V. (arm cylinder fully extended) 3-pin T-adapter I 1 Reference value tiometer when the arm cylinder is at MIN. (Fully re- [Voltage between @ and @ of the boom top poten- tracted)] = 4.47 f 0.08V lower the boom to put the bucket in contact with Extend the bucket and arm cylinders fully, and 4. If the voltage is not 0.88 + O.O8V, remove cover the ground.

Assemble in as the same way for the boom foot as for the boom foot potentiometer. (27) and adjust the potentiometer in the same way potentiometer. Stop the engine and turn the starting switch OFF. 5. After completing adjustment of the boom top potentiometer, remove the T-adapter and connect (CN-69) of the boom top potentiometer. Install a 3-pin T-adapter to Econoseal connector the Econoseal connector (CN-69). A When removing of installing the Econoseal A When removing or installing the Econoseal connector, turn the starting switch OFF first. connector, turn the starting switch OFF first. NO. 9 - 18.21.22, and 30 form a sub-assembly (cover (27) is also temporarily assembled) 138