E- 8: Work equipment piping (between chassis and boom) .......................... 107 E- 9: Work equipment piping ................................................ 108 E-10: Flushing work equipment piping .......................................... 113 E-l 1: Installation of boom cylinder foot pin ..................................... 115 Installation of boom cylinder hoses ........................................ 116 E-12: E-13: Installation of boom cylinder top pin ...................................... 117 E-14: Installation of arm cylinder hoses ......................................... 118 E-15: Installation of bucket cylinder piping ...................................... 119 E-16:
Installation of bottom dump cylinder piping’ ................................. 120 E-17: Installation of bucket assembly ........................................... 121 E-18: E-19: Maintenance standard .................................................. 124 Installation of bottom dump cylinder piping ................................. 126 E-20: Installation of work equipment piping clamps ................................ 127 E-21: Installation of working lamp ............................................. 129 E-22: Installation of work equipment grease piping ................................ 130 E-23: Bleeding air from work equipment circuit ................................... 133 E-24:
Check oil level in hydraulic tank, add oil .................................... 134 E-25: E-26: Installation of boom foot potentiometer .................................... 136 Installation and adjustment of boom top potentiometer (boom - arm joint) ........ 138 E-27: Installation of clamps and cover for boom foot potentiometer ................... 139 E-28: Installation of clamps and cover for boom top potentiometer .................... 140 E-29: Adjustment of work equipment controller (for automatic control of loading shovel) .................................. 141 F. ASSEMBLY OF MACHINE (Part III) F- 1:
Extending track frame gauge width (only when divided into three parts for transportation) . . . . . . . . . . . . . . , . . . . . . . . 148 F- 2: Installation of travel piping covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150 G. CHECK OF ALL PARTS DURING AND AFTER ASSEMBLY . . . . . . . . . . . . . . . . . . . . 152 H_ pcqooo-1 &“C AUSTRALIA SPECIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 153 APPENDIX FIELD ASSEMBLY INSPECTION REPORT 3