Doosan DX140R/DX140LCR — To Handle a New Excavator

3 Operation TO HANDLE A NEW EXCAVATOR All DOOSAN excavators are inspected and adjusted before leaving the factory. However, it is required that operator follow these steps during the initial break-in period. Failure to follow these steps can result in damage to the equipment or reduced performance. If machine is used at full load before it is broken in, it may affect the life cycle and safe running operations. This could lead to problems later. NOTE: 1. Check daily for leakage of coolant, fuel, engine oil and hydraulic oil. 2. Inspect all lubricants daily, add appropriate lubricants as required. 3. During operation, monitor all instruments and gauges from time to time. 4.

Avoid an extreme engine load. 5. Operate unit at 80% load until engine and all other components are at operating temperature. 6. Check that work equipment is operating normally during operation. 7. Check machine for loose parts or for damage that may have occurred during shipping. 8. Check for loose wiring or terminals, check gauge operation and battery electrolyte level. Operation 3-1 DX140R/DX140LCR Hour Load For first 50 hours of operation. Maintain about 80% load of full capacity (Engine rpm: 80% of rated rpm) After first 50 hours of operation. Full load