Doosan DX140R/DX140LCR — Warning for Counterweight and Front Attachment Removal

9. Extend bucket and arm cylinders to maximum length and then lower the boom slowly. FG000327 Figure 7 10. Move safety lever to "LOCK" position. Unlock EX1300566 Figure 8 Lock 11. Stop engine by turning key to "O" (OFF) position (Figure 9). O I 12. Remove key from starter switch. Figure 9 FG000175 13. Make sure to secure the excavator onto the trailer before transporting. Place blocking (1, Figure 10) in front of and behind each track. Tie front and rear (2, Figure 11) and tie down point (3, Figure 11) on the lower frame with wire cable as required by local transportation laws. 14. Refer to the Dimensions for Transportation table and drawing for overall machine height and width measurements.

Make sure to position the excavator as shown. If not transported in this position, the height measurements may be different. Figure 10 DX140R/DX140LCR Transportation 5-4 1 1 2 FG000334