MAINTENANCE MAINTENANCE PROCEDURE Bucket Clearance - Adjust WARNING It is dangerous if the work equipment moves by mistake when the clearance is being adjusted. Set the work equipment in a stable condition, then stop the engine and lock the safety lock lever securely. 1. Set the work equipment to the position shown in the dia- gram at right, stop the engine and set the lock lever to the locked position. 2. Shift O-ring (1) of the linkage and measure the amount of play "a". Measurement is easier of you move the bucket to one side or the other so all the play can be measured in one place. Use a gap (clearance) gauge for easy and accurate mea- surement. 3.
Loosen 4 plate mounting bolts (2), and loosen plate (3). The shim is a split type, so the operation can be carried out without removing the bolts. 4. Remove shim (4) corresponding to the amount of play "a" measured above. Two shims form one set. The thickness of shim (4) is 0.5 mm(0.02 in) for each shim. If play "a" is smaller than the thickness of one shim, do not tighten bolt (2) to adjust. 5. Tighten 4 bolts (2) . If bolt (2) is stiff and cannot be tightened, it may be easier to remove ring plate (5) and tighten the bolts. 4-41