Komatsu — System Operation

OM4031.2 Maintenance - Section 4 Automatic Lube System Page 4- 17 FIGURE 3-4. ELECTRICAL SCHEMATIC 1. 24VDC Timer 2. Pressure Switch; N.O., 2500 psi (17 237 kPa) 3. Relay 4. Pump Solenoid Valve 5. Manual Test Switch (If Equipped)