Komatsu — STARTING ENGINE IN COLD WEATHER

OPERATION MACHINE OPERATIONS AND CONTROLS 3. Hold the key in starting switch (3) at the HEAT position, and check that preheating monitor (4) lights up. After about 18 seconds, preheating monitor lamp (4) will flash to indicate that preheating is finished. REMARK The monitors and gauges will light up also when the key is turned to the HEAT position, but this is not an abnormality. 4. When preheating monitor (4) goes out, turn the key in starting switch (3) to the START position to start the engine. 5. When the engine starts, release the key in starting switch (3). The key will return automatically to the ON position. 6.

Even after the engine is started, do not touch the work equipment control levers and the travel pedals, while the engine hydraulic pressure monitor lamp is still lighted. 3-73