. MAINTENANCE MAINTENANCE PROCEDURE MAINTENANCE MAINTENANCE PROCEDURE cap (3). 4 - 25 2. Remove the cover and turn radiator slowly to 3. Remove covers (4) and (5), and pl antifreez the lowe e- mixed cooling water und r part of the radiator and a water dra pan. 4. 5. Open dr After dra ain valves (6) and (7) to dra ining the antifreeze solution then fill w ith clean water. After the r start and run the engine at low idli ure rises above 90°C (19 minutes. temperat about 10 6. Stop the engine and open drain valv water. 7. After dra ining the water, clean the r When c arrying out the flushin instructio ns given with the flushing 8.
Replace the corrosion resistor, and open valve (1).(Only machines equipped with corro For deta ils of replacement of the DGE (PAGE 4-69)". ain valves (6), (7). e covers (4) and (5). corrosion resistor cartridge, see "REPLACE CORROSION RESISTOR he water filler. CARTRI 9. Close dr 10. Install th 11. Add cool ant until it overflows from t Decide t he proportions of antifreeze and water according to the table for the mixing rate of water and antifreeze. 12. Run the engine at low idling for 5 mi nutes to remove the air fro m the water, then run at h igh idling for 5 minutes. ( Leave r adiator cap (3) removed w 13.
After dra ining off the coolant of sub t the sub t ank and refill the water betw 14. Stop the engine, wait for 3 minute water lev