Komatsu — CHECK BEFORE STARTING ENGINE, ADJUST

. OPERATION OPERATION OPERATION OPERATION position. If 3 - 106 3. C heck that the bucket is completely l owered to th e ground it is not compl etely lowered , lower the bucket to the ground s follows. 1) Check that the HOLD posit the FREE p ion, then set the work equipment l ock leve r to 2) Operate the bucket to th 3) Check that the HOLD posit the LOCK p ion, then set the work equipment l ock leve r to 4. C 5. In sert the key i n starting switch (4), turn the key to the ON p osition, and ch eck that the machine monitor syst em work s. hen the starti ng switch is t urned to the ON pos ition before tarting the en arning lamp li gine, all the monitor s, gauges, and central ght up for approx.

3 or approx. 1 sec. seconds, and the alarm e is probably a failure or uzzer sounds f or approx. 1 any monitor d oes not light isconnection. spection. addition, after all the monitors, gau ges, and cen tral warning mp light up, a self check is carrie d out to che ck that the mergency stee ring function works p roperly. For details, see EMERGENCY STEERIN G SEL F-CHECK section. FUNCTION PAGE 3-127)" in the OPERATION