2. Clean the area around the seal ring (12). 9. Check for nitrogen leaks around the protective plug (11). Coat the area around the protective plug (11) with soapy water. If soap bubbles form, retighten the protective plug (11). 3. Thread the sealing nut (5) of the adapter (7) onto the accumulator. Tighten the adapter securely. Close the nitrogen bleeder valve (8). 4. Thread the nitrogen cylinder fitting (1) onto the nitrogen cylinder. 10. Install the protective cap (10) on the accumulator. 5. Open the valve on the nitrogen cylinder and charge the accumulator to a pressure that is higher than the primary pressure (P1) 30 kg/cm 2 (427 psi). Close the valve on the nitrogen cylinder. WARNING!!!

Accumulators store nitrogen under high pressure. Before replacing an accumulator, install an adapter (7) with a bleeder valve (8) on the accumulator. Slowly and carefully bleed off all nitrogen before removing the accumulator from the hydraulic system. NOTE Wait 2 or 3 minutes for the nitrogen to warm to the ambient temperature. This will stabilize the pressure. 6. Slowly open the nitrogen bleeder valve (8). Open the valve (8) until the gauge (4) reading is equal to the primary pressure. Close the bleeder valve (8). NOTE After an accumulator has been installed, or after an accumulator has been recharged with nitrogen, check the nitrogen pressure (P1) after the first week of operation.

Check for a pressure drop due to leaks. If no pressure drop is found after the first week, check again after 3 more weeks. If no pres- sure drop is found after 3 weeks, check after one year. 7. Unscrew the adapter (7) from the accumulator (6). 8. Thread the protective plug (11) into the accu- mulator. Tighten to 3 kg m (21.7 psi). Mega 300-III Shop Manual HYDRAULIC SYSTEM 7-43