Komatsu — 24.1 INITIAL 10 HOURS SERVICE

24. SERVICE PROCEDURE 24.1 INITIAL 10 HOURS SERVICE 24.1 .I BLADE CUTTING EDGE HARDWARE Check the torque of the blade cutting edge hardware. U Plow bolt nuts: 455 Narn (335 Ibf ft) 24.1.2 TRACK SHOE BOLT TORQUE The bolts used for attaching the track shoes to the tracks are heat treated alloy bolts and will stand a considerable tightening strain. Ordinary bolts must not be used. Nuts must be assembled so that washer face is not against track link. Radius side of nuts must be against track link. Torque bolts to below listed value. U Track shoe bolt: 90 220 Nom (65 f15 Ibf ft) plus 120” + 120” designates two flats of bolt head. 3-25