. OPERATION OPERATION CAUTION 3 - 66 V belt tension adjusting met hod hanged by adjusting the turnbuckle located behind the crusher motor. e to tighten the lock nut. on window. that tension load F for one V-belt is 5 kgf). (When this is done, deflection erage value of the measurement for V-belts. er 2-5 times. again for each V-belt, and check that in the specified value of 48.9 to 58.9 is is done, deflection δ is 15 mm.) on window. rn the fuel control dial to the MAX crusher and check that there is no V-belt. If the V-belt slips, it emits a The V belt tension may be c hanged by adjusting the turnbuckl e loc ated behin d the crusher motor. After the adjustment, be sur 1.
Open the V-belt inspecti 2. Adjust the turnbuckle so 63.6 to 73.6 N {6.5 to 7. δ is 15 mm (0.59 in).) Tension load F is the av the tension load for nine 3. Start and stop the crush 4. Measure tension load F the measurement is with N {5 to 6 kgf). (When th 5. Close the V-belt inspecti 6. Start the engine and tu position. Next, start and stop the slipping sound from the loud noise. REMARK 1. Open the V-belt inspecti 2. Adjust the turnbuckle so There may be a difference in the V-belt tension between the top (A) a nd bottom (B).
Repeat Step s 2 and 3 to adjust the belt tension, and start an d stop the crusher 2 to 5 times to remove the difference i n tensio n between the t op and bottom, then carry out Step 4 to check the tension. 3. Start and stop the crush 4. Measure tension load F again for each V-belt, and check in the specified value of 48.9 to is is done, deflection δ is 15 mm.) 5. Close the V-belt inspecti A feature of the V-belt is that the V-belt tension may drop greatly in the f irst 4 to 8 hours o f operation, so after the firs t 4 to 8 hours o f operation, repeat the procedu re in "METHOD FOR ADJUSTING V-BELT TE NSION" to adjust the V -be lt tension.