. OPERATION OPERATION TRAVEL PREPARATIONS FOR MUCK DISCHARGE CONVEYOR 2. Start the engine. 3. Set conveyor selector switch (1) on the conveyor up/down control panel to MUCK DISCHARGE CONVEYOR (b). 4. Press muck discharge conveyor UP switch (3) and fold the conveyor. 5. Insert pin (4) in the travel lock bracket to fix the conveyor in position. 3 - 81 Bend the muc k discharge convey or (if equ ipped) as follow 1. Remove lo ck bolt (1) for the c onveyor center side cove r, then raise (bend) the side (M12 x 2)