. OPERATION OPERATION EXAMPLE FOR DESIRABLE OPERATION STEP 1 the feeder and adjust the amount that is fed into the hopper. STEP 2 STEP 3 3 - 110 The opti mum amount of rubble to feed i n the hopper at one tim e is 0.5 to 0. 7 m3 (0.6 5 to 0.92 cu.yd ). Use 50% of the capacity ( top surface of trough) as a guideline. However, c hec k the condition on Feeding he s creen soils and sand from c oncrete debris completely. Note: Do not feed the next lot of debris immediately. When th e remaining debris decreased almo st to the half, feed the next lot. Repeat t he same practice thereafter