. OPERATION OPERATION instructions set forth in the JAW CRUSHER OPERATION (PAGE 3-91)", 3 - 115 3. Enter the machine from the sid e of the en gine fr ame and remove the accumulated steel rods. 4. After all t he reinforcing bars ha ve been re move d, attach t he earth spillage preventive rubber plates that were detached in Item 2 NOTICE Be sure to pus h in th e rubber part of the earth spilla ge preventive plate s on to the p rimary conveyor frame surface after attaching them to th e machine 5. Following start t he work again. sectio n "STARTING