Komatsu — LOADING, UNLOADING WORK

. OPERATION TRANSPORTATION OPERATION TRANSPORTATION 5. Set conveyor selector switch (1) on the conveyor up/down control panel to CONVEYOR (a). (Only for machines equipped with muck discharge conveyor.) 6. Press conveyor UP switch (2) and remove the conveyor from the mount hook. the mount Install pins (1) (left and right, two places) in the order (B) -> (A). 3 - 124 7. Using conveyor hook to fixed positio n (3) for t ravel switch, set Install the grizzly feeder transportation lock pins. 8. Remo ve travel lever lock (A).