Komatsu — SAFETY CRITICAL PARTS

. MAINTENANCE PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS SAFETY CRITICAL PARTS Replacement Interval Every 2 years or every 4000 hours, whichever earlier. 4 - 19 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS To en sure saf ety at all times when operating or driving t he ma chine, t he user of th e m achine must a lways carry out perio dic maintenance. In ad dition, to further improve safety, t he parts in th e safety-critical parts list o n the next page must also be replaced at th e specified inter val. These parts are particularly closely connected to safet y and fire prevention, so please conta ct your Komats u distributor to ha ve the m replaced.

Mate rial qualit y of these par ts can change a s time passes an d they are likely to wea r out or deteriorate. However, it is d ifficult to determine the extent of wear o r deterioration at t he time of periodic maintenance. Hen ce, it is required to re place the m with new o nes regardless of their condition after a This ensu re that th ese parts mai ntain their full p erformance at all times. Furthermore, should anythi ng abnormal be found on parts perio dic replacement time f or the part has n If any of the h ose clamps sh ow deterioration like deformation or cracking, replace th e clamps at th e sam e time as the h oses.

Also perform t he following checks with hydr aulic hoses whic h need to be replaced periodically.

T ighten all loose clam ps and re place defecti ve hoses, as req Whe n replaci ng hoses, alw ays replace O-ri ngs, gaskets, an d other such parts a t th e same No Periodic Replacement Part Q'ty 1 Fuel hose (fuel tank - connector) 2 2 Spill hose (nozzle - fuel tank) 1 3 Spill hose (between nozzles) 2 4 Fuel hose (fuelo filter - fuel injection pump) 2 5 fuel pump outlet hose (fuel pump - control valve) 2 6 Work equipment hose (at crusher motor gate) 4 7 Work equipment hose (feeder motor gate) 2 8 Work equipment hose (primary conveyor belt motor gate) 2 9 Main suction hose 1 10 Gear pump suction hose 1