PRECAUTIONS TO BE TAKEN DURING WORK 3 - MOVE THE LOAD AWAY IN HORIZONTAL DIRECTION One arm outstretched and hand in vertical position with the palm facing towards the load to be moved away: move the hand in the direction of the movement to be carried out. 4 - BRING THE LOAD NEARER IN HORIZONTAL DIRECTION One arm outstretched and hand in vertical position with the palm facing towards yourself: move the hand in the direction of the movement to be carried out. 5 - LIFT THE BOOM One arm laterally outstretched in horizontal position and clenched fingers: point the thumb upwards. 6 - LOWER THE BOOM One arm laterally outstretched in horizontal position and clenched fingers:
point the thumb downwards. 7 - SWING THE BOOM One arm laterally outstretched in horizontal position: point the forefinger towards the desired swing direction. 8 - SWING THE BOOM One arm laterally outstretched in horizontal position: point the forefinger towards the desired swing direction. 40