Hyundai Construction Equipment — 2.7.5 Installing pulley

ELECTRICAL SYSTEM 2.7.2 Installing stator CAUTION Soldering must be finished as quickly as possible. Extended heating will damage the diodes. Stator Lead wire Rectifier Install the stator and solder the leads of the stator to the rectifier. Installing stator 2.7.3 Installing front bearing Drive the front bearing into the front bracket and secure the bearing retainer with a screw. Front bracket Front bearing Installing front bearing 2.7.4 Installing rear bearing Press-fit the rear bearing to the rotor. Rear bearing Rotor Installing rear bearing 2.7.5 Installing pulley (1) Insert the rotor into the front bracket. Apply a cloth to the rotor and set it in a vise.

(2) Install the spacer and pulley, and secure the pulley with a nut. Hold the base of claw with a vice. Installing pulley 12-23