Hyundai Construction Equipment — 1. Disassembling and inspecting cylinder head and valve mechanism

DISASSEMBLY OF BASIC ENGINE 1.

Disassembling and inspecting cylinder head and valve mechanism 1 Replace 9 10 4 8 3 Wear Damaged threads, worn rod contact surface 5 2 Worn valve cap contact surface, clogged oil holes Wear, clogged oil holes 7 12 6 11 Wear at both ends, deflection 15 16 Fatigue, damage 17 Crack, damage, carbon deposits, water scale adhesion Replace 20 14 Wear 21 Replace 13 Uneven wear Uneven wear on stems and faces, damage, fatigue 18 19 Disassembling and inspecting cylinder head and valve mechanism Disassembling sequence 1 Rocker cover 8 Rocker arm (EX) 15 Valve cotter 2 Adjusting screw 9 Rocker shaft spring 16 Valve retainer 3 Bolt (short) 10 Rocker shaft 17 Valve spring 4 Bolt (long) 11 Valve cap 18 Valve (IN) 5 Rocker shaft bracket 12 Push rod 19 Valve (EX) 6 Snap ring 13 Cylinder head bolt 20 Valve stem seal 7 Rocker arm (IN) 14 Cylinder head 21 Cylinder head gasket 5-2