Hyundai Construction Equipment — REASSEMBLY OF BASIC ENGINE

REASSEMBLY OF BASIC ENGINE 1. Reassembling piston, connecting rod, crankshaft and crankcase ...............7-2 1.1 Installing main bearing............................. 7-2 1.2 Installing thrust plate................................ 7-2 1.3 Installing tappet........................................ 7-2 1.4 Installing crankshaft ................................. 7-2 1.5 Installing main bearing caps .................... 7-3 1.6 Inserting side seal.................................... 7-3 1.7 Installing main bearing cap bolt ............... 7-3 1.8 Measuring crankshaft end play................

7-4 1.9 Reassembling piston and connecting rod 7-4 1.10 Installing piston ring ................................. 7-5 1.11 Preparation for installing pistons.............. 7-5 1.12 Installing connecting rod bolt and connecting rod bearing............................................... 7-6 1.13 Installing pistons ...................................... 7-6 1.14 Installing connecting rod cap ................... 7-7 4. Reassembling cylinder head and valve mechanism ................................... 7-16 4.1 Cleaning cylinder head bottom surface.. 7-16 4.2 Installing valve stem seal ....................... 7-16 4.3 Installing valve and valve spring ............

7-16 4.4 Installing cylinder head gasket............... 7-17 4.5 Installing cylinder head assembly .......... 7-17 4.6 Tightening cylinder head bolts ............... 7-17 4.7 Inserting push rod .................................. 7-18 4.8 Reassembling rocker shaft assembly .... 7-18 4.9 Installing rocker shaft assembly............. 7-18 4.10 Determining top dead center of No. 1 cylinder compression stroke................................ 7-19 4.10.1 When reusing the damper ....................... 7-19 4.10.2 When replacing the damper with a new one........................................................... 7-19 4.11 Adjusting valve clearance ......................

7-19 4.12 Installing rocker cover ............................ 7-19 2. Reassembling timing gear and camshaft..........................................7-8 2.1 Installing oil pump .................................... 7-8 2.2 Installing front plate.................................. 7-8 2.3 Installing camshaft gear and thrust plate . 7-9 2.4 Installing camshaft ................................... 7-9 2.5 Installing PTO drive gear ......................... 7-9 2.6 Installing idler gear................................. 7-10 2.7 Installing oil pump gear.......................... 7-11 2.8 Installing fuel injection pump..................

7-11 2.9 Inspecting and adjusting timing gear after installation.............................................. 7-11 2.9.1 Inspecting backlash and end play ............7-11 2.10 Installing front oil seal ............................ 7-12 2.11 Installing timing gear case ..................... 7-12 2.12 Installing oil strainer ............................... 7-12 2.13 Installing oil pan ..................................... 7-13 2.14 Installing cover....................................... 7-14 2.15 Installing crankshaft pulley and damper. 7-14 3. Reassembling flywheel .................7-15 3.1 Installing oil seal.....................................

7-15 3.2 Installing rear plate................................. 7-15 3.3 Installing flywheel................................... 7-15 7-1