Operation 3.4 Transportation Lifting procedure When the machine is raised, check that there is no oil leakage from the hydraulic circuits. When carrying out the lifting operation, please contact your KOMATSU distributor. Lifting work can be carried out only for machines with lifting marks. Before starting the lifting operation, stop the machine in a horizontal place and do as follows. 1. Start the engine, make sure that the machine is horizontal, then set the work equipment to the travel posture. For details, see "Preparations for moving the machine (3-114)". 270 mm GK032054 2.
Check that the work equipment control lever is at the HOLD position, then set the safety lock lever to the LOCK position. Free Lock GK038007 3. Stop the engine, check that the area around the operator's compartment is safe, then lock with the safety bar so that the front frame and rear frame do not articulate. 4. Use wire ropes and slings that match the weight of the machine, and wind the wire rope and fix it to the lifting points as shown in the figure. NOTE ! Use protectors, etc. so that the wire ropes will not be broken at sharp edges or narrow places. GK047005 Free Lock ! Use spreaders and bars having sufficient width so that they will not touch the machine. !
For machines equipped with a rear full fender, remove the rear full fender before carrying out the operation. 5. After setting the wire ropes, lift up the machine and stop at 100 to 200 mm above the ground, and check that the wire ropes are not slack and the machine is level, then lift up slowly. WA470-6H – VEAM946100 3-155 CAUTION CAUTION