emoval and installation of tensioner blade Preceding work: Timing case cover removed (01-210). PO5-0071-35 Timing chain (21) and crankshaft gear . . . . . . . . mark (Number 1). Timing chain and camshaft timing gear (4) . . . . . mark (Number 2). ................... unbolt, bolt up, put to one side with lines connected (Number 4). Camshaft timing gear (4) Oil pressure pump (69) Chain tensioner (36 to 41) . . . . . . . . . . . . . . . . remove, install (05310). .................. unbolt, bolt up, 80 Nm (Number 5). Tensioner blade (22) ..................... remove from bearing bolt, put on.
Note On double roller chain, spot drill bearing pin (26) and drive out with the impact extractor 115 589 12 33 00. Install new tensioner blade with bearing pin (Numbers 7 and 9). Camshaft adjustment . . . . . . . . . . . . . . . . . . . . check (Number 11). Plastic support (23) . . . . . . . . . . . . . . . . . . . . . check, possibly renew (Number 8). 05.0906 - 330/l