Group 25 Ignition and Charging System ADJUST ARMATURE AIR GAP 1. Turn flywheel magnet away from armature. 2. Insert feeler gauge blade (B), between flywheel and armature. M80271 -UN-11MAR91 M80298 -UN-11MAR91 3. Push armature against flywheel and tighten screws (A). 4. Turn flywheel to remove gauge. AIR GAP SPECIFICATIONS FA130D and FA210D-AS20 Feeler Gauge Blade FA130D . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.50 mm (0.019 in.) FA210D . . . . . . . . . . . . . . . . . . . . . . . . . . .
0.30 mm (0.012 in.) FA210D-AS19-01/AS17/BS17/CS17 CTM5 (20OCT92) 20-25-1 K Series Air Cooled Engine MX,2025A1,A2 -19-21OCT92 AllTractorManuals.com 220596 PN=86 REMOVE AND INSTALL ARMATURE WITH COIL 1. Remove blower housing. (See Group 10.) 2. Disconnect wiring lead (C). -UN-11MAR91 3. Remove cap screws (A) and armature with coil (B). 4. Loosely install armature with coil. M80270 5. Connect wiring lead. FA130D and FA210D-AS20 6. Adjust armature air gap. (See this group.) 7. Install blower housing. -UN-11MAR91 M80297 FA210D-AS19-01/AS17/BS17/CS17 MX,2025A1,A1 -19-21OCT92 20 25 1