Deutz — Job card overview (Sorted alphabetically)

5 Job card overview 5.1 Sorted alphabetically 2011 5 0312 1644 - 0138 3/4 © 11/2004 Activity Job card Maintenance group Assemble and disassemble engine on assembly stand W 00-05-01 Engine general Check and set valve clearance W 01-01-01 Cylinder head Check compression W 00-02-06 Engine general Check V-belt, renew (in FL and BFL engines) W 12-02-01 Other components Check V-belt, renew (in FM and BFM engines) W 12-02-01 Other components Disassemble and complete, check toggle lever and toggle lever block W 01-02-06 Cylinder head Remove and install air intake pipe W 06-07-03 Exhaust system / Charging Remove and install cable harness W 13-01-02 Electrical components Remove and install charge pressure-depedent full load stop (LDA) W 07-08-02 Fuel system Remove and install cooling blower W 09-11-01 Cooling system Remove and install crankcase bleeding W 03-01-11 crankcase Remove and install cylinder head W 01-04-04 Cylinder head Remove and install exhaust manifold W 06-01-05 Exhaust system / Charging Remove and install flywheel W 12-06-01 Other components Remove and install fuel filter console W 07-10-08 Fuel system Remove and install fuel lines (with Bosch injection pumps) W 07-10-06 Fuel system Remove and install fuel lines (with leak fuel line) W 07-10-06 Fuel system Remove and install fuel pump W 07-11-01 Fuel system Remove and install generator (in FL and BFL engines) W 13-02-03 Electrical components Remove and install generator and holder (in FM and BFM engines) W 13-02-03 Electrical components Remove and install helical heater plugs W 13-06-01 Electrical components Remove and install hydraulic pump W 12-08-02 Other components Remove and install injection valves W 07-07-01 Fuel system Remove and install lifting magnet (shutoff magnet) W 11-00-03 Monitoring system