Deutz — Job card overview (Sorted numerically)

5 Job card overview 5.2 Sorted numerically 2011 5 0312 1645 - 0138 3/4 © 11/2004 Job card Activity Maintenance group W 00-02-06 Check compression Engine general W 00-05-01 Assemble and disassemble engine on engine block Engine general W 01-01-01 Check and set valve clearance Cylinder head W 01-02-02 Remove and install toggle lever and toggle lever block Cylinder head W 01-02-06 Disassemble and complete, check toggle lever and toggle lever block Cylinder head W 01-04-04 Remove and install cylinder head Cylinder head W 03-01-11 Remove and install crankcase bleeding Crankcase W 06-01-05 Remove and install exhaust manifold Exhaust system / Charging W 06-06-04 Remove and install turbocharger Exhaust system / Charging W 06-07-03 Remove and install air intake pipe Exhaust system / Charging W 07-02-07 Remove and install lifting magnet for start volume release Fuel system W 07-03-01 Renew injection lines Fuel system W 07-07-01 Remove and install injection valves Fuel system W 07-08-01 Remove and install solenoid valve (LDA) Fuel system W 07-08-02 Remove and install charge pressure-depedent full load stop (LDA) Fuel system W 07-10-06 Remove and install fuel lines (with Bosch injection pumps) Fuel system W 07-10-06 Remove and install fuel lines (with leak fuel line) Fuel system W 07-10-08 Remove and install fuel filter console Fuel system W 07-11-01 Remove and install fuel pump Fuel system W 08-08-02 Remove and install oil cooler Lube oil system W 08-10-06 Remove and install oil filter cartridge Lube oil system W 08-11-07 Remove and install oil filter console Lube oil system W 08-11-08 Remove and install oil pressure switch Lube oil system W 08-11-09 Remove and install oil pressure sensor Lube oil system