Deutz — Checking piston overhang

Cylinder head TCD 2013 2V W 08-03-02 Checking piston overhang Standard tools W 08-03-01 W 49-02-01 Special tools: Dial gauge 100400 Measuring device 100750 6 Checking piston overhang ●Attach turning gear. W 49-02-01 ●Remove cylinder head. W 08-03-01 ●Turn the crankshaft until the respective piston is just in front of the top dead centre (arrow). Keep the cylinder liner pressed down to the stop. © 44150-0 ●Insert dial gauge into measuring beam. ●Place shims (1) and measuring beam (2) on the seal - ing surface of the crankcase. ●Apply the stylus to the piston base (arrow) under pre- tension.

●Continue turning the crankshaft evenly until the re - versal point of the pointer on the dial gauge is reached. 2 The piston is now at top dead centre (TDC). 1 1 © 44151-0 © 02/2010 OBJ_DOKU-21770-001.fm 1/2