Deutz — Removing and installing the coolant pump (V-belt drive)

Coolant pump TCD 2013 2V W 37-03-01 Removing and installing the coolant pump (V-belt drive) Standard tools: V-belt tension measuring device 8115 Operation manual W 38-02-01 Attention! Only test / tighten / renew V-belts with the engine at a standstill. Packing compound DEUTZ DW 76 Collect leaking operating substances in suitable vessels and dispose of according to regulations. Emptying and filling the engine with opera - ting media must be carried out according to the operating manual and the appropriate documentation of the vehicle/equipment manufacturer. 6 The V-belt tension of new V-belts must be checked after they have been running for 15 minutes.

Removing coolant pump ●Loosen screws (1). Do not unscrew screws. 1 1 1 © 44513-0 © 02/2010 OBJ_DOKU-21796-001.fm 1/8