Deutz — 5.1 Sorted alphabetically

Job card overview TCD 2013 2V Sorted alphabetically 5 © 02/2010 OBJ_DOKU-21742-001.fm 5/12 Activity Job card Maintenance group Removing and installing the piston cooling nozzles W 01-08-01 Crankcase Removing and installing the pressure holding valve W 01-07-03 Crankcase Removing and installing the pressure limiting valve W 21-02-03 Fuel pipes Removing and installing the pressure/temperature sensor (charge air) W 48-03-01 Electrical equipment Removing and installing the rail W 21-02-01 Fuel pipes Removing and installing the rail pressure sensor W 21-02-05 Fuel pipes Removing and installing the rocker arm and rocker arm bracket W 11-02-01 Control parts Removing and installing the solenoid valve (exhaust gas return) W 08-02-02 Cylinder head Removing and installing the starter W 44-03-01 Starter Removing and installing the thermostat W 38-01-01 Thermostat housing Removing and installing the thermostat housing W 38-02-01 Thermostat housing Removing and installing the turbocharger W 43-01-01 Exhaust gas turbocharger Removing and installing the valves W 08-04-01 Cylinder head Removing and installing the V-belt, V-belt pulley W 05-01-01 V-belt pulley add-on Removing and installing torsional vibration damper (V-belt drive) W 05-02-01 Torsional vibration damper Renewing the crankshaft sealing ring (flywheel side) W 09-01-01 Gearcase Renewing the crankshaft sealing ring (opposite side to flywheel) W 01-02-01 Front cover Setting valve clearance (with exhaust return module installed) W 11-01-01 Control parts Setting valve clearance (with or without removal of exhaust return module) W 11-01-01 Control parts Testing the cylinder liner W 04-01-02 Cylinder liner