Deutz — 5.2 Sorted numerically

Job card overview TCD 2013 2V Sorted numerically 5 © 02/2010 OBJ_DOKU-21742-001.fm 11/12 Job card Activity Maintenance group W 41-01-01 Removing and installing the exhaust line Exhaust pipe W 43-01-01 Removing and installing the turbocharger Exhaust gas turbocharger W 44-02-01 Removing and installing the generator (V-belt drive) Generator W 44-03-01 Removing and installing the starter Starter W 46-00-01 Mounting engine on assembly block and demoun- ting Engine mounting W 47-01-01 Removing and installing the engine mounting (elastic mounting) Engine mounting W 48-01-01 Removing and installing the cable harness Cable harness W 48-02-01 Removing and installing the impulse transmitter (crankshaft) Electrical equipment W 48-02-03 Removing and installing the impulse transmitter (camshaft) Electrical equipment W 48-03-01 Removing and installing the pressure/temperature sensor (charge air) Electrical equipment W 48-04-01 Removing and installing the oil pressure switch Electrical equipment W 48-05-01 Removing and installing temperature transmitter (coolant) Electrical equipment W 48-06-01 Removing and installing the fuel pressure sensor Electrical equipment W 49-02-01 Installing and removing turning gear Tools W 49-02-02 Installing and removing turning gear (Torsional vib- ration damper) Tools W 52-01-01 Removing and installing the connection housing Connection housing W 52-01-02 Check alignment of connection housing Connection housing W 63-01-01 Removing and install the heating flange Start aid W 63-02-01 Removing and installing the glow plugs Start aid