Crankcase TCD 2013 2V W 01-07-03 Removing and installing the pressure holding valve Standard tools W 16-01-01 Special tools: Slide hammer 150800 Collect leaking operating substances in suitable vessels and dispose of according to regulations. Locking agent DEUTZ DW 71 6 Removing the pressure holding valve ●Remove oil suction pipe W 16-01-01 ●Pull out oil dipstick. ●Drill out hole with a 6.7 mm Ш drill. Make sure no chips get into the crankcase. Coat spiral drill thickly with grease, so that no drill shavings fall into the crankcase. © 44570-0 ●Cut thread M8 x 1.25. © 44571-0 © 02/2010 OBJ_DOKU-21749-001.fm 1/4