Hitachi Construction Machinery — Aftertreatment Device Regeneration Switch

OPERATOR'S STATION Secondary Steering Operation Check Switch (Option) Use this switch to check if the secondary steering pump is operable. While the ON side of switch (1) is being pressed, secondary steering pump operates. Secondary steering indicator (2) lights ON while the pump is operating. After checking, release switch (1) to turn it OFF. 3 1 IMPORTANT: Conduct test only within 2 second. 115MNEC-07-01 1 M4GB-01-088 2 MNHG-01-290EN Aftertreatment Device Regeneration Switch Use this switch (3) to start the aftertreatment device manual regeneration procedures when it is requested. Refer to page 5-13 for details. 1-108