Komatsu — MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION

MAINTENANCE DRAINING HYDRAULIC OIL TANK (Only for machines in which the synthetic biodegradable oil type HEES is used). Stop the engine, and place machine in the correct posi- tion to perform maintenance operations. Eliminate resid- ual pressures from the equipment (by moving the controls more than once) and from the tank (by slowly loosening the filling cap). Let the oil cool down until it reaches 40-45°C (104-113°F) before performing any maintenance. Immediately clean any area dirty with oil. This operation serves to let condensation accumulated on the tank bottom to flow out of the tank itself. Perform the following operations in the given sequence: 1.

Remove screws (1) and platform (2), using a 17 mm wrench. 2. Loosen filler cap (3) to release residual pressure from the tank, using a 24 mm wrench. 3. Remove drain plug (4) and let condensation flown out of the tank completely, using a 41 mm wrench. 4. Reinstall filler cap (3) and platform (2). # Draining the tank must be done at temperatures exceeding 0°C (32°F), before starting the engine. When temperature is below 0°C (32°F), hydraulic oil tank must be drained at the end of work, or when temperature of the machine is sufficiently high, to prevent condensation from freezing and allow it to flow out of the tank. 3-46 WB140-2N, WB150-2N