UPPERSTRUCTURE / Fan Motor 19. Install pipe (51) to hose (47). Install hose (41) to pipe (56). Tighten bands (43, 45, 48) (2 used for each) with nuts (42, 44, 46) (2 used for each). 35 36, 37 : 11 mm 20. Install clamps (50, 52) to pipe (51) with bolts (49, 53). A B : 50 N m (5.1 kgf m, 37 lbf ft) 21. Install pipe (59) to hose (35). Install hose (55) to pipe (59). Tighten bands (37, 56) (2 used for each) with nuts (36, 54) (2 used for each). : 17 mm Machine Front 44, 45 42, 43 W1J1-02-13-005 41 51 52 Machine Front 53 W1J1-02-13-017 Detail for Part A 61 : 11 mm 22. Install clamps (58, 60) to pipe (59) with bolts (57, 61). 60 54 59 58 57 : 17 mm :
50 N m (5.1 kgf m, 37 lbf ft) W1J1-02-13-016 56 55 Detail for Part B W2-13-19 46 4 7 48 49, 50