FRONT ATTACHMENT / Front Attachment IMPORTANT: When the arm has been removed from the boom, perform the followings when installing the arm. 15. Install shim (14) to the left and right sides of arm. Shim (14) thickness: 8.0 mm 16. Insert the shim between the arm and shim (14) so that the clearance between shim and arm is within 1.5 mm. Shim thickness: 1.0 mm or 2.0 mm 17. After installing the arm, apply grease into the boom/arm joint pin and the rod side of arm cylinder by using a grease gun. As for the machine attached with the auto lubrication device (Optional), turn the auto lubrication switch ON IMPORTANT: For handling of HN bushing for the front attachment, check the followings.
Precautions when installing the bushing When installing the bushing and if a hammer is used, the bushing may be damaged. Install the bushing by using a press. Precautions when reinforcing the arm The heat when welding in order to reinforce the arm may cause oil leakage and decrease lubrication performance. When lubrication oil leaks, replace the bushing. 14 Arm Boom W166-04-01-100 Boom / Arm Joint Pin Arm Cylinder Rod Side Boom / Arm Joint Pin W166-04-01-101 W4-1-8