Perkins — To dismantle and to assemble Operation 5-4

400 Series 5 Main bearings To dismantle and to assemble Operation 5-4 Engine Torque Nm (lbf ft) kgf m 403C-11 Bearing holder setscrew 23 (16.9) 2,3 403C-15, 404C-22 and 404C-22T Bearing holder setscrew 52 (38.3) 5,2 End float If the end float is greater than the service limit check the thrust washers for wear. Note: Item (1) only used on 404C-22 and 404C-22T.

Engine Standard clearance Service limit 403C-11 0,10 - 0,30 mm (0.0040 - 0.0120 in) 0,50 mm (0.0197 in) 403C-15, 404C-22 and 404C-22T 0,10 - 0,40 mm (0.0040 - 0.0160 in) 0,50 mm (0.0197 in) 403C-11 21,85 - 21,95 mm (0.8602 - 0.8641 in) 21,6 mm (0.8503 in) Engine Thrust washer thickness Service limit 403C-15, 404C-22 and 404C-22T 2,95 - 3,00 mm (0.1161 - 0.1181 in) 2,80 mm (0.1102 in) 1 Identify the location of bearing carriers on the crankshaft and mark before removal. 2 Install bearing carriers on the crankshaft, ensure that the lubricating oil holes align with the feed holes in the cylinder block. 3 Check end float clearance. Note:

Ensure that the thrust washers are aligned correctly, fitted with their oil grooves towards the crankshaft. 4 Check the thrust washers for wear, poor contact or damage, if damaged renew. 1 H1067 Workshop Manual, TPD 1458E, issue 3 - Perkins Confidential: Green 49