Perkins — To remove and to fit Operation 11-1

400 Series 11 Fuel system 11 Atomisers To remove and to fit Operation 11-1 Cautions : Use only deep sockets for this operation. Connections should be blanked off until assembly. Washer (1) has two small holes 180° apart. Discard old washer (2), on assembly fit new nozzle washer. Note: If the atomisers or injection pipes are replaced it is essential that the fuel adjustment screw is not altered from the original settings. The maximum no load speed must be checked after assembly. Continued 1 2 3 H1098/1 Workshop Manual, TPD 1458E, issue 3 - Perkins Confidential:

Green 85 Engine Torque Nm (lbf ft) kgf m Test pressure kgf/cm² (lbf/in²) ats Atomi All models Atomi Nut - l ser 64 (47) 6,5 150 (2133) 145 ser high-pressure pipes 23 (16.9) 2,3 eak off-rail 27 (19.9) 2,7