23. MAINTENANCE SCHEDULE CHART 23.1 MAINTENANCE SCHEDULE CHART SERVICE ITEM PAGE INITIAL 250 HOURS SERVICE (only after the first 250 hours) Replace fuel filter cartridge 3-52 Replace transmission filter element and torque converter oil filter element 3-53 Change oil in power train oil pan, clean strainer (incl.
transmission, torque converter and bevel gear cases) 3-54 Change oil hydraulic tank, replace hydraulic filter element 3-58 Change oil in final drive case 3-59 Check enaine valve clearance, adiust 3-61 WHEN REQUIRED Clean inside of cooling system 3-22 Check, clean and replace air cleaner element 3-26 Check track tension Check and tighten track shoe bolts 3-29 3-28 Adjust idler clearance 3-30 Reverse and replace the end bits and cutting edges 3-31 Check and clean radiator fin 3-33 Clean fuel tank strainer 3-33 Drain water and sediment in fuel tank 3-33 Clean, adjust air conditioner 3-34 Check window washer fluid level, add fluid 3-35 Check APS (Automatic Priming System) 3-36 Adjustment of fan belt 3-36 CHECK BEFORE STARTING Check machine monitor 3-37 Check coolant level, add water 3-37 Check fuel level, add fuel Check oil level in engine oil pan, add oil 3-39 Check oil level in power train (incl.
transmission, torque converter and bevel gear 3-40 3-18