MAINTENANCE PLAN 4.7 MAINTENANCE PLAN 4.7.1 WHEN REQUIRED 4.7.2 MAINTENANCE INTERVALS IN CASE OF USE OF THE DEMOLITION HAMMER (BREAKER) 4.7.3 CHECKS BEFORE STARTING 4.7.4 MAINTENANCE EVERY 100 HOURS OF OPERATION 140 N. PART OPERATION PAGE a Cooling circuit Wash 142 b Fuel tank Drain the condensate 143 c Electrical system Check 143 d Steel tracks Check and adjust the tension 144 e Rubber tracks Check 146 f Rubber tracks Check and adjust the tension 148 g Rubber tracks Change 150 h Air cleaner Check, clean or change 152 N. PART OPERATION PAGE a Hydraulic oil filter Change the cartridge 153 b Hydraulic oil tank Change the oil 153 N.
PART OPERATION PAGE a Various checks — 154 b Coolant Check and top up 154 c Fuel tank Check and top up 155 d Engine oil pan Check and top up 155 e Hydraulic oil tank Check and top up 156 f Air cleaner clogging indicator Check 157 g Fuel filter Check 157 N. PART OPERATION PAGE a Joint and ball-bearing ring articulations Lubricate 158