Komatsu — 4.7.1.F CHECKING THE RUBBER TRACK TENSION

MAINTENANCE PLAN 149 ADJUSTMENT WARNING • The grease contained in the hydraulic cylinder is under pressure. For this reason, do not loosen the greasing valve (1) giving it more than one turn; if the valve is loosened ex- cessively, it may be pushed out due to the grease pressure and this is very dangerous for the operator. Do not loosen any other component apart from the valve (1). • If you notice excessive resistance while injecting grease, slowly move the machine forward and backward for a short distance. 2 WARNING • The grease contained in the hydraulic cylinder is under pressure.

For this reason, do not loosen the greasing valve (1) giving it more than one turn; if the valve is loosened ex- cessively, it may be pushed out due to the grease pressure and this is very dangerous for the operator. Do not loosen any other component apart from the valve (1). • If you notice excessive resistance while injecting grease, slowly move the machine forward and backward for a short distance. 1 - To increase the tension, carefully clean the greasing valve (1) and inject grease through the greaser (2) until reaching the de- sired tension. 2 - To reduce the tension, gradually loosen the greasing valve (1) to let the grease out; do not give the valve more than one turn.

Use a 19 mm hexagon spanner. 3 - If the grease does not flow out freely, move the machine slowly forward and backward for a short distance. 4 - Tighten the valve and remove any trace of grease. 5 - Move the machine forward and backward, stop it and check the track tension again. 6 - If the rubber track tension is not sufficient even after the injec- tion of grease, change the track or the idler seals. For these operations, contact your Komatsu Dealer. 1 RWA09320 1 RWA09320 IMPORTANT IMPORTANT • The wear of the rubber tracks varies according to the work conditions and to the characteristics of the ground on which the machine is operated.

Therefore, it is necessary to check the track tension fre- quently, in order to keep it constant. • After the installation of new tracks, it is advisable to carry out a first check after 30 hours of operation.