. OPERATION TRANSPORTATION Lifting work can be carried out only for machines with lifting marks. Before starting the lifting operation, stop the NOTICE 3 - 149 machine i n a horizo ntal place an d do as follow 1. Start t he engine , make sur e that the ma chine is horizontal then s et the wor k equipment to the travel posture. For de tails, see "MOVING T HE MACHIN E (PAGE 3-115)". (A): 40 - 50 cm ( 16 - 20 in) 2. Check that the work equipm ent control le ver is at the HOLD positio n, then se t the work e quipment loc k lever to the LOCK positio 3.
Stop t he engine , check tha t the area ar ound the operator's compartment is safe, then lo ck with the fr ame lock bar so that the fro nt frame a nd rear fram e do not artic ulate. 4. Use w ire ropes and slings th at match the weight of the machine, and wind the wire r ope and fix it to the lifting points as shown in the figure . Use prot ectors, etc. so that the w ire ropes will n ot be broken at sharp Use thre aders and b ars having su fficient width s o that the slings and wire ropes will not touch t For mac hines equip ped with a re ar full fender, re move the rear ful l fender before carrying out the 5.
Before lifting up t he machine , set the slings and floa t the machine to 100 mm - 200 mm above the ground. Make sure th at the wir e ropes are not slack and the machine is kept horizontally, and then l ift up the machine slowly.