Komatsu — 23. MAINTENANCE SCHEDULE CHART

23.

MAINTENANCE SCHEDULE CHART SERVICE ITEM PAGE EVERY 250 HOURS SERVICE Lubricating l Fan pulley (I place) 3-38 l Brace screw (tiltdozer 1 place / angledozer 2 places) 3-38 l Cylinder support shaft (2 places) 3-39 l Cylinder support yoke (4 places) 3-39 l Tilt cylinder ball joint (I place) 3-39 l Brace ball joint (I place) (only tiltdozer) 3-39 l Arm ball joint (3 places) (only tiltdozer) 3-40 l Oblique arm bail joint (2 places) (only tiltdozer) 3-40 l Ripper top link (8 places) 3-40 l Ripper cylinder rod end (2 places) 3-40 l Ripper bottom link pin (boom end) (4 places) 3-40 l Ripper bottom link (bracket end) (6 places) 3-40 l Check oil level in final drive case, add oil 3-41 Check oil level in hydraulic tank, add oil 3-41 Check level of battery electrolyte 3-42 Check alternator drive belt tension, adjust 3-43 Clean strainer at bottom of fuel tank 3-44 Replace transmission filter element and steering oil filter element (2 places) 3-44 EVERY 500 HOURS SERVICE Replace fuel filter cartridge 3-45 Grease tension pulley 3-46 Clean steering clutch case breather (I place) 3-46 Change oil in engine oil pan, replace engine oil filter cartridge and bypass filter cartridge Clean final drive case breather (2 places) 3-46 3-47 Check fan belt 3-48 3-17